Key Infrastructure · 03
100% underground · delivered with Phase IUtilities
Photo: OCIC · Norea City
Overview
What you need to know.
All utilities at Norea City are underground — power, water, sewerage, telecoms, and fibre — eliminating overhead clutter and improving storm resilience. Capacity is sized for full build-out so future tenants and residents face no upgrade surprises.
Dedicated substations, water treatment, and stormwater management are integrated with the masterplan from day one.
- 01Routing
- 100% underground
- 02Services
- Power · water · sewerage · telecoms · fibre
- 03Sizing
- Full 125-hectare build-out capacity from day one
- 04Substations
- Dedicated on-island
- 05Water management
- On-island treatment + stormwater management
- 06Fibre
- To every premises
- 07Upgrade exposure
- None — capacity already provisioned
Why this matters
The numbers that define Utilities.
100%
Underground
Day-one
Capacity
5
Services
What’s inside
A closer look.

Photo: OCIC · Norea City
Every utility is underground — power, water, sewerage, telecoms, and fibre — eliminating overhead clutter and improving storm resilience.
Capacity is sized for the full 125-hectare build-out from day one — no upgrade tax for tenants or residents as occupancy grows.
Dedicated substations, water treatment, and stormwater management are integrated with the masterplan, not retrofitted.
Fibre to every premises supports day-one tenancy, smart-building features, and future tech upgrades.
“Built underground. Built to last.”
Norea City — Engineering brief
Backed by
Developed byOCIC
Financed byCanadia Bank PLC
Infrastructure systems
Where this system fits.
- 01 · DeliveredBridgesCable-stayed bridge in operation · 2025
- 02 · In progressRoadsPhase I network delivered · expansion ongoing
- 03 · DeliveredUtilities100% underground · delivered with Phase I
- 04 · DeliveredPublic CleaningDaily service operating since 2025
- 05 · DeliveredPublic Safety24/7 patrols and CCTV operating since Phase I
- 06 · In progressSmart City FeaturesResident app live · sensor network expanding
- 07 · PlannedUpcoming InfrastructureSequenced to match Phase II–IV growth